image description
A rally last week at the Verizon store in Pittsfield called for the protection of net neutrality.

Berkshire County Groups Call for Action to Protect Net Neutrality

By Mark HurwitCommunity Submission
Print Story | Email Story
PITTSFIELD, Mass. — More than 40 bundled-up Berkshire citizens gathered on the sidewalk in front of the Pittsfield Verizon store last Thursday evening, holding home-made placards and signs, to join tens of thousands of others for a day of peaceful protests at more than 600 Verizon store locations across the country.
 
The issue at hand — one they insist affects everyone — is an upcoming congressional vote on the Federal Communications Commission's plan to repeal the rules that currently restrict how large broadband companies can control their users' access.
 
Eileen Raab, who organized the Pittsfield rally, said she was "very pleased with the turnout. Members of Pittsfield United and Greylock Together made this event a success. We all need to stand up for net neutrality and protect freedom of speech on the Internet." 
 
Thursday's rally was part of Net Neutrality Call for Action held across the country — and the internet — to raise awareness of the impending vote that could change how Americans use and access the World Wide Web. 
 
Local Greylock Together member Jessica Dils, in thanking the Indivisible Pittsfield members for their solidarity, stressed that net neutrality "is critical to our democracy and the open access to the information we often take for granted."
 
The internet, originally founded on an idea called net neutrality, has until now been governed by a set of legal protections referred to as "Title Two," preventing companies like Comcast, Verizon, and AT&T from blocking or censoring websites (or levying extra fees), restricting app use and online services, or otherwise interfering with online traffic through the "throttling back" of connection speeds.
 
The new chairman of the FCC, Ajit Pai (previously a top lawyer at Verizon) has scheduled a Dec. 14 vote to kill net neutrality — what has been called "the First Amendment of the internet" through protecting free speech in the digital age, giving more people a voice than ever before and being used as a critical platform for organizing.
 
Barbara van Schewick, a Stanford Law School professor and director of the Stanford Center for Internet and Society, writes that Pai's plan "discards decades of careful work by FCC chairs of both political parties, who recognized and acted against the danger internet service providers posed to the free markets that rose out of and depend on the Internet. If his plan takes effect, ISPs would be free to disrupt how the Internet has worked for 30 years."
 
Verizon has spent millions of dollars on lobbyists, campaign contributions and think tanks to spread misinformation against net neutrality and create a corporate-managed internet, Evan Greer, campaign director for Fight for the Future, said the goal of the store protests was to "shine light on this corruption, and to urge local communities to do something about it."
 
And though little publicized, once the FCC intentions were clear the public outcry "has been deafening" said Free Press Action Fund Field Director Mary Alice Crim.
 
"The phones are ringing off the hook on Capitol Hill, as people urge Congress to put the public need for an open internet
first. It's changing many minds in Washington," she said. 
 
Congress has the power to force Pai to cancel the vote and nine out of Massachusetts' 11 House legislators have already come out firmly against Pai's move (see battleforthenet.com/#scoreboard). Dozens of lawmakers from both sides of the aisle have now taken stands against the FCC plan.
 
"The past week has shown that people across the country reject the ongoing love affair between these ISPs and DC policymakers," Demand Progress Director of Communications Mark Stanley said. "Democrats and Republicans alike are willing to take actions to protect their online rights." 
 
Anyone can let their representatives in Washington know what they think.
 
iBerkshires.com accepts community submissions related to events and issues of interest to our readers. 

Tags: Internet,   net neutrality,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Crosby/Conte Statement of Interest Gets OK From Council

By Brittany PolitoiBerkshires Staff

Architect Carl Franceschi and Superintendent Joseph Curtis address the City Council on Tuesday.

PITTSFIELD, Mass. — With the approval of all necessary bodies, the school district will submit a statement of interest for a combined build on the site of Crosby Elementary School.

The City Council on Tuesday unanimously gave Superintendent Joseph Curtis the green light for the SOI to the Massachusetts School Building Authority by April 12.

"The statement I would make is we should have learned by our mistakes in the past," Mayor Peter Marchetti said.

"Twenty years ago, we could have built a wastewater treatment plant a lot cheaper than we could a couple of years ago and we can wait 10 years and get in line to build a new school or we can start now and, hopefully, when we get into that process and be able to do it cheaper then we can do a decade from now."

The proposal rebuilds Conte Community School and Crosby on the West Street site with shared facilities, as both have outdated campuses, insufficient layouts, and need significant repair. A rough timeline shows a feasibility study in 2026 with design and construction ranging from 2027 to 2028.

Following the SOI, the next step would be a feasibility study to determine the specific needs and parameters of the project, costing about $1.5 million and partially covered by the state. There is a potential for 80 percent reimbursement through the MSBA, who will decide on the project by the end of the year.

Earlier this month, city officials took a tour of both schools — some were shocked at the conditions students are learning in.

Silvio O. Conte Community School, built in 1974, is a 69,500 square foot open-concept facility that was popular in the 1960s and 1970s but the quad classroom layout poses educational and security risks.  John C. Crosby Elementary School, built in 1962, is about 69,800 square feet and was built as a junior high school so several aspects had to be adapted for elementary use.

Ward 6 Councilor Dina Lampiasi said the walkthrough was "striking" at points, particularly at Conte, and had her thinking there was no way she would want her child educated there. She recognized that not everyone has the ability to choose where their child goes to school and "we need to do better."

"The two facilities that we are looking at I think are a great place to start," she said.

"As the Ward 6 councilor, this is where my residents and my students are going to school so selfishly yes, I want to see this project happen but looking at how we are educating Pittsfield students, this is going to give us a big bang for our buck and it's going to help improve the educational experience of a vast group of students in our city."

During the tour, Ward 5 Councilor Patrick Kavey, saw where it could be difficult to pay attention in an open classroom with so much going on and imagined the struggle for students.

Councilor at Large Alisa Costa said, "we cannot afford not to do this" because the city needs schools that people want their children to attend.

"I know that every financial decision we make is tough but we have to figure this out. If the roof on your house were crumbling in, you'd have to figure it out and that's where we're at and we can't afford to wait any longer," she said.

"We can't afford for the sake of the children going to our schools, for the sake of our city that we want to see grow so we have to build a city where people want to go."

Councilor at Large Kathy Amuso, who served on the School Building Needs Commission for about 18 years, pointed out that the panel identified a need to address Conte in 2008.

Curtis addressed questions about the fate of Conte if the build were to happen, explaining that it could be kept as an active space for community use, house the Eagle Academy or the Adult Learning Center, or house the central offices.

School attendance zones are a point of discussion for the entire school district and for this project.

"At one time I think we had 36 school buildings and now we have essentially 12 and then it would go down again but in a thoughtful way," Curtis said.

Currently, eight attendance zones designate where a student will go to elementary school. Part of the vision is to collapse those zones into three with hopes of building a plan that incorporates partner schools in each attendance zone.

"I think that going from eight schools to three would be easier to maintain and I think it would make more sense but in order to get there we will have to build these buildings and we will have to spend money," Kavey said, hoping that the city would receive the 80 percent reimbursement it is vying for.

This plan for West Street, which is subject to change, has the potential to house grades pre-kindergarten to first grade in one school and Grades 2 to 4 in another with both having their own identities and administrations. 

The districtwide vision for middle school students is to divide all students into a grade five and six school and a grade seven and eight school to ensure equity.

"The vagueness of what that looks like is worrisome to some folks that I have talked to," Lampiasi said.

Curtis emphasized that these changes would have to be voted on by the School Committee and include public input.

"We've talked about it conceptually just to illustrate a possible grade span allocation," he said. "No decisions have been made at all by the School Committee, even the grade-span proposals."

School Committee Chair William Cameron said it is civic duty of the committee and council to move forward with the SOI.
 
He explained that when seven of the city's schools were renovated in the late 1990s, the community schools were only 25 years old and Crosby was 35 years old.  The commonwealth did not deem them to be sorely in need of renovation or replacement.
 
"Now 25 years later, Crosby is physically decrepit and an eyesore. It houses students ages three to 11 in a facility meant for use by teenagers,"
 
"Conte and Morningside opened in the mid-1970s. They were built as then state-of-the-art schools featuring large elongated rectangles of open instructional space. Over almost half a century, these physical arrangements have proven to be inadequate for teaching core academic skills effectively to students, many of whom need extra services and a distraction-free environment if they are to realize their full academic potential."
 
He said  the proposal addresses a serious problem in the "economically poorest, most ethnically, culturally, and linguistically diverse area" of the city.
 
Cameron added that these facilities have been deemed unsatisfactory and need to be replaced as part of the project to reimagine how the city can best meet the educational needs of its students.  He said it is the local government's job to move this project forward to ensure that children learn in an environment that is conducive to their thriving academically.
 
"The process of meeting this responsibility needs to begin here tonight," he said.
 
View Full Story

More Pittsfield Stories