image description
The new terminal for Harriman & West makes its way down the airport's entrance to its new location.

North Adams Moves New Airport Administrative Building

Staff ReportsPrint Story | Email Story
NORTH ADAMS, Mass. — Thursday was moving day at Harriman & West Airport as the new administrative building was shifted 150 yards onto its new foundation parallel to the runway. 
 
A crew from Wolfe House & Building Movers of Bernville, Pa., had lifted the two-story building off its original pad and onto a motorized trailer for the short hike around the corner. 
 
The 20-year-old building had housed a medical practice and was constructed on land leased from the airport. The practice, which had come under the umbrella of the former Northern Berkshire Healthcare, moved several years ago to the main campus of the former hospital. The building was donated to the city by Berkshire Health Systems, which did not have a need for it after acquiring NBH's assets. 
 
The gaining the structure was a lucky break for the airport, which had planned on building a $4 million contemporary terminal several years ago. Harriman & West had been found to be among 17 airports in the state with deficient administrative buildings.
 
The funding was to come largely from the Aeronautics Division of the state Department of Transportation. North Adams was designated to be award the funds in a second round of grants but the funding dried up at that time. Last year, the Airport Commission proposed revamping the medical practice, which will be funded through MassDOT. 
 
The structure will contain administrative offices and a small public restaurant, although that will be slightly larger than the previous version with 62 seats. The second floor will also hold offices, storage and mechanicals. 
 
The total cost of the move and renovation is $3.6 million. Officials are hoping it will bring more attention to the airport by providing an area for residents and visitors to gather. 
 
The move took about two hours and drew a crowd of onlookers despite the frigid cold. One electrical line had to be moved but no traffic was affected. DA Sullivan & Sons was awarded the contract to transform the structure. 
 
See more photos from the move here; a live feed from the first part of the move available here

Tags: airport,   airport terminal,   big move,   harriman west,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

North Adams Public Schools To Host Grade Configuration Forum

NORTH ADAMS, Mass. — North Adams Public Schools will host a community forum to discuss updates on grade configurations and logistics for the 2024-2025 school year.
 
The forum will take place on Wednesday, May 15 at 6 PM. The forum will take place in a hybrid format at the Welcome
Center at Brayton Elementary School and via Zoom which can be accessed by going to napsk12.org/ZoomLinkMay15.
 
Forums are open to anyone interested in learning more about the logistics planned for the upcoming school year, including, transportation, arrival and dismissal times, class sizes, and school choice updates. The forum will also allow participants to ask questions and provide feedback.
 
For questions, please contact the Family and Community Outreach Coordinator, Emily Schiavoni at 413-412-1106 or at eschiavoni@napsk12.org.
View Full Story

More North Adams Stories