Berkshire Mall Road Getting $10M in Stimulus Funding

Staff reportsiBerkshires
Print Story | Email Story
LANESBOROUGH, Mass. — The long-delayed Berkshire Mall road is among 33 priority projects targeted for a second round of stimulus funding totaling more than $165.6 million.

The list released by the Patrick administration on Monday includes $10,128,284 for the two-mile roadway. It is a public road operated by the Baker Hill Road District with the Berkshire Mall its only taxpayer.

The main connector between Routes 7 and 8 has been waiting for state funding for more than decade but heavy traffic has severely deteriorated the road over its 20-year existence. The surface has gotten so bad, some ambulance services have refused to use it.

Built primarily as an access road to the mall, reconstruction plans signify its importance as a connector between North and Central Berkshire's main north/south highways.

The project includes widening sections of the winding road and eliminating the need to enter into the traffic ring around the mall. Instead, the road will run straight to Route 8 with right- and lefthand turns into the mall drive. It will include full reconstruction, resurfacing, guardrails, granite curbs, traffic signals, retaining walls signage and drainage improvements, along with work on the bridge.


Construction is expected to begin in 2010, if an agreement can be hammered out with two other stakeholders bordering the byway, Pittsfield and Petricca.

Also in the funding is $2.8 million for resurfacing First Street, Barker Road, Holmes Road and Valentime Road in Pittsfield.

"These projects put stimulus money and Massachusetts people to work," said Gov. Deval Patrick. "This administration is all about investing in our future, and these funds help."

The complete list can be found here.
If you would like to contribute information on this article, contact us at info@iberkshires.com.

Lanesborough Passes FY 2027 Budget, Warrant Articles

By Breanna SteeleiBerkshires Staff
LANESBOROUGH, Mass. — Town meeting on Tuesday approved an almost $14 million fiscal 2027 budget, and approved bylaws for short-term rentals and signage, and for public safety vehicles. 
 
Of the 20 warrant articles, one, Article 7, to use free cash to pay prior fiscal year bills of $941.27 was indefinitely postponed by Moderator David Rolle because the bills were for the fire association.
 
Some 247 of the town's more than 2,600 registered voters filled Lanesborough Elementary School, debating articles during a meeting that lasted more than three hours. 
 
The town's 2027 spending plan is up more than 10 percent, with the main increases from higher enrollment in the regional schools and the McCann Technical School renovation project.
 
Voters approved the assessment of $7,586,284 for Mount Greylock Regional School. They also approved Article 11, which was the use of $16,298.48 in free cash for the McCann's roof and window replacement project so as not to impact the budget. 
 
Ambulance Director Jen Weber is planning 24-hour coverage, which means more staff and a hike in her budget. Article 5 asked the town to appropriate $234,100 to operate the Ambulance Enterprise Fund for salaries and expenses, which passed.
 
Fire Chief Jeff DeChaine spoke to the audience on his articles and the need for a new truck to replace the 1996 fire truck, listed on the warrant articles for a total $813,366, which includes a $100,000 contingency cost on whether a 2026 model-year chassis can be secured before new emissions standards in 2027. If they get the 2026 chassis, that contingency likely won't be needed.
 
View Full Story

More Lanesborough Stories