Police Caution Residents To Avoid Black Bears

Print Story | Email Story

This bear wandered back into woods but hadn't left the immediate neighborhood around Brayton School by Friday evening.
NORTH ADAMS, Mass. — Black bears have been coming closer to homes around the region this spring. The most recent siting has been near Brayton Elementary School over past few days. 

Neighbors in the area reported seeing the bear in the brook behind the school and he (most likely) was spotted on Friday in a tree near the Northern Berkshire YMCA.

Police are urging people to stay calm if they see a bear and to back away from it slowly.  Black bears are not particularly hostile but can be dangerous if frightened, or over food or cubs.

Bears are attracted by food, so police say:

• Never feed bears and make sure no food, dirty grills, bird feeders (bring them in at night) or accessible trash containers are around to attract them, especially at night. Garbage containers should be frequently washed with a disinfectant solution to remove odors.

• For those with fruit or nut trees, removing fallen fruit or nuts will minimize bear activity in your yard.

The department has more information on its Facebook page.


Tags: bears,   wild animals,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Williamstown Fire Committee Talks Station Project Cuts, Truck Replacement

By Stephen DravisiBerkshires Staff
WILLIAMSTOWN, Mass. — The Prudential Committee on Wednesday signed off on more than $1 million in cost cutting measures for the planned Main Street fire station.
 
Some of the "value engineering" changes are cosmetic, while at least one pushes off a planned expense into the future.
 
The committee, which oversees the Fire District, also made plans to hold meetings over the next two Wednesdays to finalize its fiscal year 2025 budget request and other warrant articles for the May 28 annual district meeting. One of those warrant articles could include a request for a new mini rescue truck.
 
The value engineering changes to the building project originated with the district's Building Committee, which asked the Prudential Committee to review and sign off.
 
In all, the cuts approved on Wednesday are estimated to trim $1.135 million off the project's price tag.
 
The biggest ticket items included $250,000 to simplify the exterior masonry, $200,000 to eliminate a side yard shed, $150,000 to switch from a metal roof to asphalt shingles and $75,000 to "white box" certain areas on the second floor of the planned building.
 
The white boxing means the interior spaces will be built but not finished. So instead of dividing a large space into six bunk rooms and installing two restrooms on the second floor, that space will be left empty and unframed for now.
 
View Full Story

More Williamstown Stories