WESTFIELD, Mass. -- Janek Luksza went 3-for-3 with a double and two RBIs Monday to lead New England champion Tri-County, Maine to an 11-1 win over Pittsfield at the 14-year-old Babe Ruth World Series.
Jett Steinman doubled and scored on a Jacob Harrington single to account for the Pittsfield run in the top of the first of a game shortened to five innings at Bullens Field.
Pittsfield (0-5) concluded its World Series run with the loss. The top three teams in each of two six-team pools advance to the single-elimination tournament that begins Tuesday morning.
With the win, Tri-County improved to 3-2 in pool play.
If you would like to contribute information on this article, contact us at info@iberkshires.com.
Your Comments
iBerkshires.com welcomes critical, respectful dialogue. Name-calling, personal attacks, libel, slander or foul language is not allowed. All comments are reviewed before posting and will be deleted or edited as necessary.
No Comments
Pittsfield Sewer Lining Replacement Projects
PITTSFIELD, Mass.—; The City's Department of Public Services and Utilities sewer lining replacement project continues the week of Dec. 8.
The sewer lining will be replaced in several locations as outlined in the schedule below. This work includes lining aging sewer pipes to help prevent future breaks within the sewer line. There should be minimal to no impact on residential sewer lines during this work.
Dec. 8-10: Danforth Avenue (7:00 a.m. to 9:00 p.m.)
Dec. 11: Wahconah Street, between North Street and Seymour Street & Park Street between
Wahconah Street and Seymour Street (Overnight work-6:00 p.m. and 5:00 a.m.)
During this time, Wahconah Street, from North Street to Seymour Street, and Park Street, from Wahconah Street to Seymour Street, will be closed to traffic. Residents and emergency vehicles will be allowed to enter and exit the street if necessary. For more information about this project, please contact the Water Department at (413) 499-9339.
At least half a foot of snow was dumped on Pittsfield during Tuesday's storm, and plowing went fairly smoothly, according to the DPW commissioner. click for more
The Berkshire Mall owners have offered the town a $1.25 million loan to dissolve the Baker Hill Road District, while the road district wants to take the property by eminent domain and says Target is on board. click for more
The City Council unanimously approved a total of $1 million in Pittsfield Economic Development Funds to expand the Berkshire Innovation Center and add a new company. click for more
The plan was last updated in 2009, and Pittsfield has engaged VHB engineering firm for a yearlong process of bringing it to the 2020s and beyond.
click for more