CATA, Berkshire Botanical Presents 'Garden Dreams'

Print Story | Email Story
STOCKBRIDGE, Mass. — Community Access to the Arts (CATA) and Berkshire Botanical Garden present "Garden Dreams," an exhibit of nature-inspired paintings and drawings by artists with disabilities. 
 
The exhibition will be on display at Berkshire Botanical Garden's Leonhardt Galleries from March 6 - March 29, 2026. The gallery, located at 5 West Stockbridge Road, Stockbridge, MA, is open Tuesday through Sunday from 11am-3pm. Admission is free.
 
A free, opening reception will be held on Friday, March 6 from 3-5pm. Registration is requested at CATAarts.org/BBG2026.
 
The exhibit features over 40 paintings, drawings, prints, and sculptures created through Community Access to the Arts' year-round workshops serving children, teens, and adults with developmental and intellectual disabilities. Works were inspired by plants, herbs, and flowers found at Berkshire Botanical Garden, as well as by the natural landscapes found across the Berkshires. 
 
Each piece was created by artists with disabilities through CATA arts programs at disability agencies, day habilitation programs, and schools across our community, as well as in CATA's studios in Great Barrington.
 
"Garden Dreams is a window into the imagination of artists with disabilities," says CATA Executive Director Margaret Keller. "We look forward each year to CATA's annual partnership with Berkshire Botanical Garden. Spring begins to bloom at the Leonhardt Galleries through our CATA artists' vivid, colorful paintings and drawings! All the art is available for sale, and every sale provides a commission to the individual artist. You are sure to find a piece to fall in love with."
 
Works are professionally matted, framed, and available for sale, with proceeds supporting commissions for the individual artists.
 
"Berkshire Botanical Garden is proud to partner with Community Access to the Arts on Garden Dreams, an exhibition that reflects the deep connection between creativity and the natural world," says Mike Beck, executive director of Berkshire Botanical Garden. "The artists of CATA capture the spirit of our gardens with remarkable imagination and joy. These works remind us that gardens are not only places of beauty, but sources of inspiration and belonging for everyone in our community."
 
In addition to creating the artwork on display, artists with disabilities also took on roles as paid Assistant Curators to shape the exhibit—including selecting artwork, framing, and helping to install the exhibit. This pilot program is part of a strategic initiative at CATA to create more leadership and job readiness pathways for artists with disabilities interested in taking a deeper dive into an art form or technical skill.
 
To enhance the exhibit and expand accessibility for visitors, CATA has also launched a digital exhibit guide on Bloomberg Connects—a free app used by major museums and cultural institutions across the globe. CATA's digital guide allows the public to experience CATA artwork as never before, with video interviews with CATA artists, audio tours, original music created by CATA artists, and other exhibit highlights. Visitors can scan QR codes throughout the gallery—or visit the digital guide to explore the exhibit from anywhere in the world.
 
"Garden Dreams" is supported by Frames on Wheels, the Massachusetts Cultural Council, and other generous funders. The exhibit is part of CATA's "Art on Tour" program, where original works of art created by CATA artists are featured in exhibits at museums, galleries, community centers, and other venues in Berkshire and Columbia counties.
If you would like to contribute information on this article, contact us at info@iberkshires.com.

Becket Looks to Wind Power for Energy Savings

By Breanna SteeleiBerkshires Staff

The single turbine is a low maintenance and has a 50-year life. The town went with wind power after finding a solar installation would be too difficult. 

BECKET, Mass. — The town unveiled a wind turbine Monday that will reduce electricity costs and show the benefits of renewable energy produced by wind.

Residents, town and state officials gathered outside the Town Hall for the ribbon cutting on a project first conceived nearly a dozen years ago.

The wind turbine stands 100-feet tall next to Town Hall and is from Oklahoma manufacturer Bergey Wind Power. It has a 50-year life and is a direct-drive permanent-magnet design, meaning it has no gearbox, making it low maintenance.

According to Garth Klimchuk, chair of the Becket Energy Committee, the town started discussions about a wind turbine in 2014. The turbine is expected to generate about 36,000 kilowatt-hours. Klimchuk said Town Hall uses about 24,000 kilowatt-hours, with excess power expected to go to the Highway Department. This is expected to save $9,000 annually from the electricity cost.

"This turbine is just going to be such a good thing for the town. It is really incredible. Zero-cost electricity. Zero cost to the town. Carbon free. Just a huge, huge milestone for us," he said.

The town received a grant from the state Department of Energy Resources totaling $139,500. The remaining funding for the project will come from a direct-pay investment tax credit under the federal Inflation Reduction Act. If the town does not receive the funding, voters at the annual town allocated $100,000 just in case, but Klimchuk said the town will only need about $60,000 to $70,000 if necessary.

"It's going to help the community. Hopefully, it'll lower our tax bills. And as we look at everything going around around the world right now, energy volatility has been with us for a long time. It's going to stay with us for a long time," said state Sen. Paul Mark. "So any move we can make as a community, whether as Becket specifically, as Berkshire County as a whole, but anything we can do to bring some of the reliability into our own hands, to produce a bit on our own, and just guarantee that in a renewable, safe way moving into the future, I think is going to pay off dividends."

The town has spent more than a decade reducing municipal energy consumption in a variety of ways including HVAC upgrades and LED street light conversions, bringing it to a Level 2 Green Community status.

While solar had been considered, interconnection constraints and limited grant opportunities made it harder to achieve. But the high elevation of Town Hall and a Small Wind Site evaluation done in 2023 and 2024 found the site was perfect for a turbine with favorably high winds.

State Rep. Leigh Davis praised the project as an example of a small town addressing a larger energy challenge through persistence and collaboration. She stressed that the single turbine represents a practical step toward reducing reliance on fossil fuels and said Becket's effort could serve as a model for communities across the commonwealth. 

"You hear about all these kind of big wind farms and solar farms and all these ways that we're gonna you know create green energy, but at the same time what we're not being sensitive to the landscape, and what I appreciate about this is that this is it's a single turbine, but it represents so much more," she said. "You're right. It's really adding to the ability for this town to contribute to green energy and to bringing our reliance on gasoline fuels back down to solving big problems."

Mark Rabinsky, deputy director of DOER's Green Communities Division, said the state supports municipalities with technical assistance and grants, and that reducing municipal energy costs can leave more resources for other local priorities. He presented the turbine as an example of state support working alongside local knowledge and decision-making. 

"I think that this is a really a great example of what green communities can do," he said. "I'm obviously a really big fan of the green communities program, but I think that connection between the state, what we're doing at the state, and that local level, and relying on the local knowledge here with Becket is a true testament to what we're doing."

Select Board Chair William Elovirta thanked everyone for being here and shared his memories of first coming tp Becket in 1946 before utility electricity arrived. His family and neighbors used small 32-volt generating plants and batteries. He recalled utility workers installing poles and wires by hand around 1947.  

View Full Story

More South Berkshire Stories