OLLI at BCC to Hold Benefit Auction and Party

Print Story | Email Story
PITTSFIELD, Mass. — The Osher Lifelong Learning Institute at Berkshire Community College (OLLI at BCC) will hold a benefit auction and party on Tuesday, May 19 from 5-7:30 p.m.
 
The event, which supports OLLI programming and scholarships, will be held at historic Ventfort Hall, located at 104 Walker Street in Lenox, MA. 
 
Tickets are $75 per person and include live music, hors d’oeuvres, beverages (wine, beer and soft drinks) and a silent auction. To register for the event and purchase tickets, visit https://berkshireolli.org/event-6614632.  
 
Online bidding for the auction is open through May 19; visit https://benefitevents.com/auctions/olli/catalog to view and bid on more than 50 lots available. Registration is required to bid. 

 


Tags: BCC,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

EPA, GE Conducting Vernal Pool Study on Housatonic River

By Brittany PolitoiBerkshires Staff

PITTSFIELD, Mass. — A pilot study will determine the best way to remediate PCBs, or polychlorinated biphenyls, from vernal pools in the Housatonic River. 

Last month, the U.S. Environmental Protection Agency and General Electric held an open house for the Vernal Pool Pilot Study on Reach 5A, a five-mile stretch between the river's confluence and Lenox border.  Despite the rain, several people attended the event at the Berkshire Athenaeum. 

EPA project manager Josh Fontaine explained that it is an evaluation of which remediation method to use for the remaining vernal pools in Reach 5A. 

"We're going to be testing two different methods. One is an excavation method, which we already know has been very successful with another vernal pool cleaned up much earlier in the project," he said. 

"And then the other is the application of two different carbon amendments. It would be the application of powdered activated carbon and the application of granulated activated carbon." 

Ten vernal pools will be cleaned using these methods: five with excavation and five with active carbon; seven additional vernal pools will be monitored as controls. Construction will be complete around October, but the pools will be left to their natural processes and monitored with surveys and sampling for three years. 

Fontaine said there is no frontrunner for methodology. 

"We know the excavation method is effective, but we would like to see if the less invasive method of using the amendment will be as effective for potential use," he said. 

View Full Story

More Pittsfield Stories