Berkshire HorseWorks Gala Celebrates Year of the Horse

Print Story | Email Story
RICHMOND, Mass. — Berkshire HorseWorks, Inc., a 501c3, which for 13 years has offered Eagala Model Equine-Assisted Psychotherapy, Equine-Assisted Learning, Equine Assisted-Team building, and other therapeutic and recreational activities with horses, invites you to celebrate the "Year of the Horse: A Year of Transformation Gala", on Sept. 18, from 6:00pm-9:00pm, at Berkshire Equestrian Center in Richmond, MA (40 Perry's Peak Road, Richmond, MA 01254).
 
This gala marks over a decade of providing programming to over 4,200 at-risk youth, active duty, veterans, families, and other vulnerable populations. The event and will honor NPC founder, Liana Toscanini, and be emceed by former Massachusetts State Representative, Smitty Pignatelli. The news was announced today by Hayley Sumner, founder, executive director, and CEO of the nonprofit.
 
Interact with BHW's rescued herd of 11 horses and ponies, and its clients as you learn about the ranch's experiential, strength-based programs.
 
Enjoy specialty drinks and hors d'oeuvres from 6:00 pm- 7:30 pm with music by The Berkshire Dreamers, before a live auction and paddle raise from 7:30 pm- 9:00 pm. Auction to support scholarships for equine-assisted programs at the ranch for those at-risk with mental health, behavioral, and academic challenges in the community and to cover medical costs for equines medical care.
 
Attire is festive Berkshire casual, with comfortable footwear suitable for both the lawn and riding arena, strongly encouraged. 
 
"Thanks to the generosity of Carl and Nancy Dunham, BHW was able to launch its nonprofit at the Berkshire Equestrian Center, enabling us to offer much-needed evidence and ground based programming to those with PTSD, addiction, trauma, and illiteracy, including Hillcrest Education Center, Department of Children and Families (DCF), Berkshire Health Systems, Berkshire County House of Corrections, Pittsfield School System," stated Sumner.
 
Tickets are limited so visit OneCause to purchase now: onecau.se/_mrwau1
For More Gala Information Visit OneCause: https://onecau.se/_mk95z1
For More Information Visit BHW's Website: https://berkshirehorseworks.com/gala
Link For Donating: onecau.se/_mk96h1
 
 
If you would like to contribute information on this article, contact us at info@iberkshires.com.

Lee Wants Bioremediation in Housatonic River Vernal Pool Study

LEE, Mass. — The town has asked the U.S. Environmental Protection Agency and General Electric to include PCB bioremediation in its vernal pool study on the Housatonic River. 

Lee officials are urging the EPA to require GE to add a bioremediation treatment arm to the vernal-pool study or provide the public with a clear explanation for why such testing is being excluded.

"This is exactly the kind of question EPA and GE should be asking before final remedy decisions are locked in," Select Board Chair Bob Jones said in a statement released to the press. "The town is not asking to slow the cleanup. We are asking EPA and GE to make the cleanup smarter, less destructive, and more protective over the long term."

An open house was held in Pittsfield earlier this summer for the Vernal Pool Pilot Study on Reach 5A of the Housatonic River, a five-mile stretch between the river's confluence and Lenox border.

EPA has required GE to conduct a Vernal Pool Pilot Study as part of the Housatonic River Rest of River remediation, comparing excavation and restoration with activated-carbon-based treatments, including a product called SediMite and powdered activated carbon, the town said. 

Ten vernal pools will be cleaned of polychlorinated biphenyls in total, five with excavation and five with active carbon, and seven additional vernal pools will be monitored as controls. Construction will be complete around October, but the pools will be left to their natural processes and monitored with surveys and sampling for three years. 

The Lee PCB Advisory Committee wrote a letter calling for the 21st-century approach it said could reduce long-term toxicity, avoid unnecessary destruction of sensitive habitats, and improve the effectiveness of the cleanup.

It states that Lee supports the study's purpose and agrees that EPA and GE must understand how cleanup activities affect sensitive vernal-pool ecosystems.

"The current pilot includes 10 treatment pools and seven control pools, while local officials understand that roughly 100 vernal pools may occur in the broader remediation corridor," the Aug. 27 letter reads. 

"That makes the pilot study consequential: the methods tested now could shape how many sensitive wetlands are excavated, reconstructed, treated, or left with PCBs managed in place."

View Full Story

More South Berkshire Stories