MassDOT: Lanesborough Daytime Paving Operations on Mall Road
LANESBOROUGH, Mass. – The Massachusetts Department of Transportation (MassDOT) is announcing it will be conducting daytime paving operations on the Route 7/8 Connector (Mall Road) in Lanesborough.
The work will take place on Tuesday, Sept. 23, from 8:00 a.m. to 11:00 a.m. During work hours, the Route 7/8 Connector (Mall Road) will be closed to traffic at the intersection of Route 7, with a posted detour in place.
Appropriate signage and law enforcement details will be in place to guide drivers through the work area.
Drivers traveling through the area should expect delays, reduce speed, and use caution.
All scheduled work is weather dependent and subject to change without notice.
Tags: MassDOT,