image description
This 1948 brick home has four bedrooms plus a separate ADU for in-laws or grandma.

Friday Front Porch Feature: A Brick Home With Guest House

By Breanna SteeleiBerkshires Staff
Print Story | Email Story

DALTON, Mass. — Are you looking for a family home that also has a perfect space for the in-laws? Then this is the home for you.

Our Friday Front Porch is a weekly feature spotlighting attractive homes for sale in Berkshire County. This week, we are showcasing 20 Prospect St.

This 1948 brick, gabled home includes four bedrooms and one and a half bathrooms. It is 2,316 square feet on less than an acre. It has has an updated kitchen but plenty of original charm. 

The home features wood floors, an eat-in kitchen, a brick fireplace, and an attached one-car garage.

The home also includes a standalone 720-square-foot in-law accessory dwelling with two bedrooms and a bathroom.

It is on the market for $425,000 with Dalton Town and Country Associates.

You can find out more about this home on its listing here.

*Front Porch Feature brings you an exclusive to some of the houses listed on our real estate page every week. Here we take a bit of a deeper dive into a certain house for sale and ask questions so you don't have to.





Tags: front porch,   Real Estate,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

EPA, GE Conducting Vernal Pool Study on Housatonic River

By Brittany PolitoiBerkshires Staff

PITTSFIELD, Mass. — A pilot study will determine the best way to remediate PCBs, or polychlorinated biphenyls, from vernal pools in the Housatonic River. 

Last month, the U.S. Environmental Protection Agency and General Electric held an open house for the Vernal Pool Pilot Study on Reach 5A, a five-mile stretch between the river's confluence and Lenox border.  Despite the rain, several people attended the event at the Berkshire Athenaeum. 

EPA project manager Josh Fontaine explained that it is an evaluation of which remediation method to use for the remaining vernal pools in Reach 5A. 

"We're going to be testing two different methods. One is an excavation method, which we already know has been very successful with another vernal pool cleaned up much earlier in the project," he said. 

"And then the other is the application of two different carbon amendments. It would be the application of powdered activated carbon and the application of granulated activated carbon." 

Ten vernal pools will be cleaned using these methods: five with excavation and five with active carbon; seven additional vernal pools will be monitored as controls. Construction will be complete around October, but the pools will be left to their natural processes and monitored with surveys and sampling for three years. 

Fontaine said there is no frontrunner for methodology. 

"We know the excavation method is effective, but we would like to see if the less invasive method of using the amendment will be as effective for potential use," he said. 

View Full Story

More Pittsfield Stories