BCC to Offer 'Speed Networking' Sessions

Staff Reports Print Story | Email Story
PITTSFIELD, Mass. — Berkshire Community College (BCC) presents "Speed Networking" on Tuesday, Aug. 18 from 8:30-10:30 a.m. in the Connector, located on BCC's main campus at 1350 West Street, Pittsfield.
 
The cost of the event is $20. To register, visit www.berkshirecc.edu/speed-networking.  
 
The series of five- to 10-minute, one-on-one conversations are designed for business owners, freelancers and entrepreneurs to make networking easier and more productive, stated a press release. Participants will have a chance to introduce their businesses, talk about what they offer, share the kinds of clients or partners they're looking for and exchange contact information. When time is called, each participant rotates to meet someone new. 
 
Visit BCC online at www.berkshirecc.edu

Tags: BCC,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

EPA, GE Conducting Vernal Pool Study on Housatonic River

By Brittany PolitoiBerkshires Staff

PITTSFIELD, Mass. — A pilot study will determine the best way to remediate PCBs, or polychlorinated biphenyls, from vernal pools in the Housatonic River. 

Last month, the U.S. Environmental Protection Agency and General Electric held an open house for the Vernal Pool Pilot Study on Reach 5A, a five-mile stretch between the river's confluence and Lenox border.  Despite the rain, several people attended the event at the Berkshire Athenaeum. 

EPA project manager Josh Fontaine explained that it is an evaluation of which remediation method to use for the remaining vernal pools in Reach 5A. 

"We're going to be testing two different methods. One is an excavation method, which we already know has been very successful with another vernal pool cleaned up much earlier in the project," he said. 

"And then the other is the application of two different carbon amendments. It would be the application of powdered activated carbon and the application of granulated activated carbon." 

Ten vernal pools will be cleaned using these methods: five with excavation and five with active carbon; seven additional vernal pools will be monitored as controls. Construction will be complete around October, but the pools will be left to their natural processes and monitored with surveys and sampling for three years. 

Fontaine said there is no frontrunner for methodology. 

"We know the excavation method is effective, but we would like to see if the less invasive method of using the amendment will be as effective for potential use," he said. 

View Full Story

More Pittsfield Stories