Governor Launches Program to Help Homeowners Build Accessory Dwelling Units

Print Story | Email Story
 
The Program, administered by the Massachusetts Housing Partnership (MHP) in collaboration with the Executive Office of Housing and Livable Communities (HLC) and previously announced by Governor Maura Healey, is designed to help homeowners access professional feasibility studies to better determine if an ADU project is right for them, including understanding site conditions, local permitting requirements, utility needs, preliminary design options and high-level cost estimates before investing significant time and resources in an ADU project. 
 
"Massachusetts needs to build more homes, and ADUs are one of the fastest ways to create new housing in communities across our state," said Governor Maura Healey. "Our Affordable Homes Act made it easier to build ADUs, and we saw major interest from homeowners. Now we're giving them the tools they need to turn an idea into reality, creating more housing options while helping families stay in the communities they love." 
 
An ADU is a small residential living space located on the same lot as another home. ADUs can be inside an existing home, such as a converted basement apartment, attached to a primary residence as an addition or completely detached, such as a cottage or converted garage in a backyard. They can provide flexible housing options for families, caregivers, renters and communities. 
 
MHP has created a directory of professional feasibility study providers to help homeowners across the state understand whether an ADU is feasible on their property and what would be involved if they choose to construct one. Feasibility studies will generally assess site conditions and constraints, local zoning and permitting considerations, utilities, preliminary design considerations and high-level cost and budget feasibility.  
 
Participation in a feasibility study does not obligate the homeowner to build an ADU, nor does it obligate the homeowner to use the chosen feasibility study provider for any additional services. 
 
MHP will use information from the feasibility studies to guide future phases of the ADU Incentive Program and identify ways to make it easier for homeowners to build ADUs. The findings will help inform future zoning guidance, financing tools, infrastructure investments and technical assistance. 
 
In addition to the MHP Accessory Dwelling Unit Incentive Program, HLC launched the ADU Design Challenge to develop publicly available, replicable ADU designs that homeowners and communities can use at no cost. Homeowners can also use the Massachusetts Clean Energy Center's ADU Resource Center to look up their property, explore where an ADU could be placed on the lot and review other early planning considerations before starting a feasibility study. The administration has committed $10 million over two years to support MHP's statewide ADU work, and MassHousing has launched a program offering low-cost ADU construction financing to low- and moderate-income homeowners 
 
The Healey-Driscoll Administration has made housing a top priority, starting with the creation of HLC in 2023. Since then, the administration has signed the Affordable Homes Act, the state's most ambitious housing law in history, advanced the conversion of vacant state-owned land and underused commercial properties into housing, implemented the MBTA Communities Law, created the Momentum Fund, increased housing tax credits and subsidies, expanded homebuyer assistance, established a right to home inspections, banned forced renter-paid broker's fees and launched the state's first housing production tracker to track progress toward the state's goal to build 222,000 homes by 2035. 
If you would like to contribute information on this article, contact us at info@iberkshires.com.

15 People Displaced in Pittsfield Home Fires

Staff Reports

PITTSFIELD, Mass. — Fifteen people were displaced after 2-alarm home fires this weekend on Springside Avenue and Elaine Drive. 

On Friday evening, the Fire Department responded to a structure fire at 209 Springside Ave., which took a four-hour battle to extinguish and resulted in a partial roof collapse. The next day, on Saturday evening, crews knocked down a fire at 121 Elaine Drive in about an hour. 

The garage and part of the single-family home on Elaine Drive were gutted to the frame, along with a vehicle parked in the driveway. On Springside Avenue, the top level and porch of the multifamily were burned through.  

A GoFundMe has been started for the family of the Elaine Drive home, which includes several young children.  The fundraiser, with a $5,500 goal, explains they lost their home and all of their belongings. (iBerkshires.com does not confirm or endorse fundraisers; they are provided as information only.)

There were no civilian or firefighter injuries, and both incidents are under investigation.  One dog was rescued on Springside Avenue. 

On Oct. 10, around 6:15 p.m., PFD responded to the Springside Avenue home for a reported structure fire and saw a 2 1/2-story wood frame multifamily with a heavy blaze showing from the second-floor front porch, extending out. 

The building suffered a partial roof collapse, which prolonged extinguishment. The fire was brought under control after about four hours.

“An aggressive offensive attack was mounted by first arriving crews stretching hose lines into the building as well as primary searches that proved negative. Ladders were placed around the structure to provide access as well as escape if needed. An off-duty Fire Captain had also been on scene early in the incident to help evacuate the structure and rescue a dog,” PFD wrote in a press release. 

View Full Story

More Pittsfield Stories