Letter: Southern Berkshire Ambulance Expresses Gratitude for Support

Letter to the EditorPrint Story | Email Story

To the Editor:

Over the next nine months, the Southern Berkshire Ambulance Squad (SBAS) will take delivery of two new ambulances, at a cost of roughly $1 million, to replace two vehicles that are very much on their last wheels. Lacking that $1 million, SBAS had to put out an emergency call of its own. I write to share the wonderful news that Berkshire Preservation Inc. (BPI) more than answered our call.

BPI's board, which includes Carole Owens, Louis Schroeter, Wende and David Carver, Nelson Furlano, and Todd Ehrlich worked tirelessly to organize a benefit concert at the Colonial Theatre that netted $98,877 for SBAS. We saw firsthand how hard they worked to bring it off, and we could not be more grateful to be the beneficiaries of their efforts and generosity.


SBAS answers your emergency calls 24/7/365. It means a great deal to us that when we were the ones in need, BPI answered ours. If you would like to learn more about BPI, and you should, please go to preservationinc.org.

With deep gratitude,

Ken Schumacher
Great Barrington, Mass. 

Ken Schumacher is president of the board of directors
of the Southern Ambulance Squad

 

 

 


Tags: ambulance service,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Lee Wants Bioremediation in Housatonic River Vernal Pool Study

LEE, Mass. — The town has asked the U.S. Environmental Protection Agency and General Electric to include PCB bioremediation in its vernal pool study on the Housatonic River. 

Lee officials are urging the EPA to require GE to add a bioremediation treatment arm to the vernal-pool study or provide the public with a clear explanation for why such testing is being excluded.

"This is exactly the kind of question EPA and GE should be asking before final remedy decisions are locked in," Select Board Chair Bob Jones said in a statement released to the press. "The town is not asking to slow the cleanup. We are asking EPA and GE to make the cleanup smarter, less destructive, and more protective over the long term."

An open house was held in Pittsfield earlier this summer for the Vernal Pool Pilot Study on Reach 5A of the Housatonic River, a five-mile stretch between the river's confluence and Lenox border.

EPA has required GE to conduct a Vernal Pool Pilot Study as part of the Housatonic River Rest of River remediation, comparing excavation and restoration with activated-carbon-based treatments, including a product called SediMite and powdered activated carbon, the town said. 

Ten vernal pools will be cleaned of polychlorinated biphenyls in total, five with excavation and five with active carbon, and seven additional vernal pools will be monitored as controls. Construction will be complete around October, but the pools will be left to their natural processes and monitored with surveys and sampling for three years. 

The Lee PCB Advisory Committee wrote a letter calling for the 21st-century approach it said could reduce long-term toxicity, avoid unnecessary destruction of sensitive habitats, and improve the effectiveness of the cleanup.

It states that Lee supports the study's purpose and agrees that EPA and GE must understand how cleanup activities affect sensitive vernal-pool ecosystems.

"The current pilot includes 10 treatment pools and seven control pools, while local officials understand that roughly 100 vernal pools may occur in the broader remediation corridor," the Aug. 27 letter reads. 

"That makes the pilot study consequential: the methods tested now could shape how many sensitive wetlands are excavated, reconstructed, treated, or left with PCBs managed in place."

View Full Story

More South Berkshire Stories