image description
A Pittsfield plow at work.

Pittsfield Council OKs Funds for Plow Truck; Refers Council Pay Recommendation

By Brittany PolitoiBerkshires Staff
Print Story | Email Story

PITTSFIELD, Mass. — Winter is right around the corner, and Pittsfield plans to purchase a vehicle to increase its snow-plowing capacity.

On Tuesday, the City Council approved the transfer of $200,000 from the Public Works Stabilization Fund for equipment. The Department of Public Services will purchase a one-ton truck equipped with an all-season body, snowplow, wing, and spreader.

Commissioner of Public Services and Utilities Ricardo Morales said it is something the department would like to have for supervision and expanding its work. 

"We need this piece of equipment to have a supervisor be able to go on the mains with a wing plow and assist on that as needed, and be able to pick up that wing and go to a neighborhood street and be able to assist with snow plowing in a neighborhood street," he explained. 

"And at the same time be able to jump throughout the city because he's supervising as well, making sure that there's volume." 

A comparable truck is included in Pittsfield's capital plan. 

These vehicles normally need to be ordered 10 to 12 months ahead of delivery, but Morales said Pittsfield identified one that can be expedited; he did not say how quickly. 

"Approving funding now gives us the best chance of having the truck built and in service for the coming snow season," he wrote in a communication to the council. 

The DPW is responsible for ensuring that roads, sidewalks, and critical public spaces are safe and accessible during winter storms. Operations cover a total of 450 lane miles: 208 miles of accepted and unaccepted streets, 6 miles of priority sidewalks, 20 city-owned buildings (including 14 school campuses), five public parking lots, two municipal parking garages, two lake access points with associated lots, and parks and conservation lands. 

Ten miles of state-owned roads are maintained by the Massachusetts Department of Transportation. 

Pittsfield currently has two of these one-ton trucks for the DPW, as well as six or seven snow fighters and pickup trucks. What it doesn't have is a plow truck with a wing and spreader capable of going on main roads and neighborhood streets, Morales said. 



In his communication, he explained the one-ton unit gives operators a smaller, more maneuverable option for neighborhood streets, narrow roads, dead ends, and tight intersections.

Additionally, with the wing and spreader, he said operators can plow, push back banks, and treat in a single pass for faster clearing of residential streets and corners, better access for emergency vehicles and school buses, and safer conditions at crossings for residents on foot.

The city has been reviewing the best approach for obtaining this equipment, given borrowing circumstances. 

While he supported the transfer, Ward 1 Councilor Kenneth Warren would have liked an earlier notification that they were looking to purchase a new vehicle, even if the funding was not yet identified. 

In other news, referred to the Ordinances and Rules subcommittee under Rule 27 was a communication from Mayor Peter Marchetti recommending to amend City Code, Chapter 16. 

It would increase city councilor pay from $8,000 per year to $12,000 a year, council president pay from $10,000 a year to $15,000 a year, and School Committee members would be paid $8,000 a year. 

"As you are aware, salaries for city councilors have not been adjusted since 1994, while those for School Committee members were last adjusted in 2014," he wrote. 

Former councilor Karen Kalinowsky, during public comment, said she thinks it is wrong, and "the people should be deciding whether the City Council or School Committee should have it raised." 

"We're talking about lowering our costs, and I believe, and when I ran, that's what I believed, that I did this as a public service to the city. It was my giving back, wanting to make the city better," she said. 

"If you're here for a job that you want to make an income, and you don't like what stipend you get today because it's not a salary, it's a stipend, maybe you should look somewhere else because the citizens of Pittsfield can't afford this."


Tags: snowplow,   stipend,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Hungerford Street Bridge Closed After MassDOT Inspection

By Brittany PolitoiBerkshires Staff

PITTSFIELD, Mass. — One of the bridges on Hungerford Street will be closed until further notice. 

On Wednesday, the city announced that, following a recent inspection by the Massachusetts Department of Transportation, the bridge at 109 Hungerford St., between Fort Hill Avenue and Caroline Street, will be completely closed to traffic, effective immediately.

This structure runs over the southwest branch of the Housatonic River; the other bridge on that leg of Hungerford Street remains open. An electric sign on West Housatonic Street notifies drivers of the closure. 

Pittsfield's Department of Public Works installed barriers and signage around the structure. 
 
On Friday around 7 a.m., across West Housatonic Street, there was a discharge of untreated wastewater between 287 Hungerford Rd. and 104 Lebanon Ave. It has since been stopped, but residents should avoid the water for a couple of days. 

A communication was sent out by the city around 10 a.m., as required by the state Department of Environmental Protection. It was caused by a blocked sewer main, and the estimated volume was about 800 gallons, possibly affecting the Southwest Branch of the Housatonic River. 

In a follow-up, Commissioner of Public Services and Utilities Ricardo Morales said the two incidents are not related, and Pittsfield does not have an estimate for the bridge work.

"The public should avoid contact with the Southwest Branch Housatonic River for 48 hours after the discharge stops due to increased health risks from bacteria and other pollutants," he wrote in the notice. 

The discharge ended around 10 a.m., with an estimated 3-hour duration. 

The DPW said this overflow consisted of untreated sewage, and again in the second communication, asked that residents avoid contact with these waterbodies for 48 hours after the discharge or overflow ceases.

View Full Story

More Pittsfield Stories