Berkshire Economic Recovery Program Announces Additional Offerings

Print Story | Email Story
PITTSFIELD, Mass. — 1Berkshire, in partnership with Berkshire Regional Planning Commission and with support from the United States Economic Development Administration, announced additional cohorts being added to the Spring 2022 slate of technical assistance offerings of the Berkshire Economic Recovery Program (BERP).
 
The Berkshire Economic Recovery Program Technical Assistance series has supported more than 35 businesses through targeted, need-specific offerings. In order to address more demand and specific needs, they announced the addition of 3 new cohorts, with one being offered entirely in Spanish. 
 
These cohorts include:
  • May 5 - "Branding Para Emprendedores" with Juliana Gomez Gomez
  • May 11 - "Get Paid: Best Practices for Selling Your Services" with Glenn Geiger
  • May 18 - "It's Time to Stop Running my Business by the Seat-Of-My-Pants" with Robin Helfand 
Participants in each topical cohort will join a scheduled kickoff workshop with the technical assistance provider. Upon completion of the workshop, each participant will be provided up to two hours of free one-on-one technical assistance from the consultant leading the workshop. 
 
The BERP Technical Assistance series is free, and offered to any business that has been operating for at least one year. Each cohort has a capacity of 7 participating businesses, so space is limited and registration is required.
 
For a list of current technical assistance offerings and links to register, please visit: https://1berkshire.com/1berkshire-programs/berkshire-economic-recovery-project-technical-assistance-program/
 
For more information, or for additional inquiries, contact the 1Berkshire Economic Development Team at EconomicDev@1berkshire.com.

Tags: 1Berkshire,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Score! Pittsfield's 'Mini-Pitch' is Ready for Goals

By Brittany PolitoiBerkshires Staff

PITTSFIELD, Mass.— The city now has a "mini-pitch" soccer field at Crane Park, placed over the longtime rink that had seen better days. 

"I think it's a real improvement," Parks, Open Space, and Natural Resources Manager James McGrath said, pointing to social media comments believing the city took away inline skating. 

"Well, we didn't do that. The surface can accept rollerblades.  In fact, as soon as this was constructed and we sort of said it's open, the first one to show up was a gentleman with rollerblades and a hockey stick. He skated around and loved it." 

The Parks Commission saw pictures of the completed field on Tuesday. 

Fueling excitement around the World Cup, U.S. Soccer worked with the Massachusetts Youth Soccer League to make these facilities available to 20 communities — one at the park at the intersection of Benedict Road and Springside Avenue. 

The project was funded entirely by grants.  In June, the City Council accepted the gift of a "mini-pitch" facility, valued at over $100,000, and $10,000 from the Mill Town Foundation to ready the site.  

Boards framing the former rink were removed, and this system was installed in a couple of days about a week and a half ago.  The mini-pitch's click-together sports tile floor is bordered by a galvanized steel system with two goals, benches, and storage containers. 

"Folks can really play lacrosse in there; they can play in-line hockey in there, and of course soccer is ready to go as well," McGrath said. 

"We're trying to continue with this multi-sport approach here at this park, but with a much upgraded piece of infrastructure going behind it." 

The mini pitch system came with a light tower and two LED lamps, but Crane Park does not have power, and it won't be illuminated. 

View Full Story

More Pittsfield Stories