Scott Henderson, senior project manager, explains the form of the new museum and how the roof will be insulated at Monday's community forum. Inset is outline of the museum.
Michael Evans and Tanja Srebotnjak of the Zhilka Center for the Environment get into details about green standards.
WILLIAMSTOWN, Mass. — The sustainable aspects of the new $175 million Williams College Museum of Art will influence the next generation of arts leaders.
"Really building a learning laboratory for sustainable art museums for the future," said Pamela Franks, museum director, at Monday night's community forum.
"One of the really distinctive features of the Williams College Museum of Art is its long tradition and contribution to the field of arts leadership. So a student who's leading a tour today may be the director of a major museum tomorrow, and everything that the student learns over the time that they're here at Williams becomes a kind of possibility for impact moving forward."
The forum at the Williams Inn was the latest public update on the museum's progress and information on its various aspects, this time on its sustainability focus.
When it opens in fall 2027, the single-story structure designed by Brooklyn-based firm SO–IL will be something of an epitome of the college's sustainability and conservation ethos, first formally adopted by the trustees in 2011.
Over nearly 20 years, construction and renovations on campus have focused on attaining energy efficiencies, with projects over $5 million required to reach the gold standard in Leadership in Energy and Environmental Design, or LEED. The college has also sought the Living Building Challenge's Petal level in several cases.
The museum is also looking to become an International Living Future Institute core building, of which only two now exist, and is focusing on Energy Use Intensity benchmarks, with the goal to operate with 70 percent less usage than a comparable 1990 museum. The structure will also be "zero ready" for solar, although it will powered through electricity not solar panels.
"That concept of regenerative design also considered the full life cycle impact of a building from construction all the way through the end of its lifespan," said Tanja Srebotnjak, executive director of the college's Zilkja Center for the Environment. "And very importantly, it centered human health, well-being, equity and community and the connection to nature inspired beauty that surrounds us."
The structure will be made of "simple" materials: a mass timber frame, bluestone and wood floors, masonry walls, wool insulation.
Scott Henderson, project manager, reiterated the "human scale" of the one-story structure with its accessible pathways, gathering spaces along the paths and under the expansive canopies, calm earth tones and large floor-to-ceiling triple-glazed windows.
The centering of arts and education will also include a healthy interior environment with air quality, natural light, and thermal comfort.
"So this is one of my favorite aspects of the project, because this shifts the focus from say, talking about a green building, to talking about who's in the building, about the occupants," he said. "So it really makes it about being in that space."
Henderson noted that the college is working with partners that share its values
"Oftentimes, we'll find companies have what's called a 'just' label, and again, that ties to their commitment within their company to support these ideas of equity, diverse, diversity and inclusion," he said.
The removal of invasives is almost complete in the northwest corner and replanting is underway. The stormwater trap — a series of large concrete chambers — is in place and will exist under the parking lot. The drains and swales of the stormwater management system will empty into the system.
The timber frame from Nordic Structures in Montreal is expected be installed this summer. (The construction team is keeping an eye on tariffs.)
The former Northside Motel is continuing to be used for construction offices and employee parking. In response to questions, Henderson said he the college is considering the future of the property but there is two years to plan.
One of the 40 or so attendees queried Franks about a subject not addressed on Monday: the art.
The director noted that WCMA has 15,000 items in its collection and that the new museum will have outdoor sculptures and 11 galleries plus a large flexible lobby inside.
"What we're doing right now is a collaborative process where all of our curators who focus on different areas of the collection, different pedagogical specialties, different modes of engagement are working together to plan the installations, and the teaching program for the future," she said. "There will be art everywhere."
The director thought this would be a good topic for a future community forum.
WCMA has been holding regular hours for community members who wish to speak to staff about the project. The next drop-in times are today, Tuesday, at 4 p.m. and May 27 at 4 p.m. More information on the project can be found here.
If you would like to contribute information on this article, contact us at info@iberkshires.com.
Your Comments
iBerkshires.com welcomes critical, respectful dialogue. Name-calling, personal attacks, libel, slander or foul language is not allowed. All comments are reviewed before posting and will be deleted or edited as necessary.
No Comments
Williamstown Police Looking into Damage at Post Office
Staff Reports
WILLIAMSTOWN, Mass. — Police are looking into property damage at the U.S. Post Office on Spring Street.
On June 28, the Police Department received a report from a member of the Williamstown Garden Club, who was watering flowers at the Post Office and, "noticed that a granite slab had been displaced and a metal grate had been damaged," according to a police report.
Officer David Jennings responded to the scene and reported that it, "appeared that a vehicle or piece of machinery had struck the granite slab, causing it to shift into the metal grate and bend it," Jennings wrote.
By the middle of July, the damage to the grate was still apparent.
Williamstown Police contacted the postmaster, who said he would notify his supervisor about the damage.
Police Chief Michael Ziemba on Wednesday confirmed there is no closed-circuit television footage that provides details on how the damage occurred.
The damage is estimated to be worth about $500, according to the police report.
The Select Board on Monday approved one request from Berkshire Gas to install equipment in the town's right-of-way and put off another request pending more information from the utility. click for more
The town is getting a jump on July 4 with a full day and night of activities on Friday to help celebrate the 250th anniversary of the Declaration of Independence. click for more
Local theaters also have to adapt to constantly-changing conditions and trends in the film and theater industry. This requires balancing the often-convoluted requirements of movie studios and distributors with the preferences and tastes of local audiences.
click for more