Milling and Paving Operations on Sections of Route 8 and Route 9
![]() |
- North and south from Merrill Road at the Dick Sporting Goods driveway to Route 8/Cheshire Road at the Berkshire Gas driveway.
- East and west from Dalton Avenue at the Housatonic Railroad Bridge overpass to Route 8 and Route 9/Dalton Avenue at the Colonial Gardens entrance.
Standard MassDOT construction work zone logistics and police details will be used for traffic control. At least one lane of travel will be open at all times.
- Dial 511 before heading out onto the roadways and select a route to hear real-time conditions.
- Visit www.mass511.com, a website which provides real-time traffic and incident advisory information, access to traffic cameras, and allows users to subscribe to text and email alerts for traffic conditions.
- Follow MassDOT on Twitter @MassDOT to receive regular updates on road and traffic conditions.
- Download MassDOT's GoTime mobile app and view real-time traffic conditions before setting out on the road.
Tags: MassDOT,


