BRPC Invites Applications for Home Modification Loan Program

Print Story | Email Story

PITTSFIELD, Mass — The Berkshire Regional Planning Commission (BRPC) is now accepting applications for the Home Modification Loan Program (HMLP).

This state-funded, no-interest loan program assists homeowners and landlords (with fewer than 10 units) in making necessary accessibility modifications to keep disabled or elderly family members in their homes.

Eligible modifications include bathroom and kitchen adjustments, ramps, stair lifts, platform lifts, sensory/therapy spaces, hard-wired alarm systems, fences, and accessory dwelling units. However, this program does not cover general home repairs such as roofing, window replacements, or heating system repairs. All work must be completed by licensed and insured contractors.

Property owners may qualify for 0 percent interest loans ranging from $1,000 to $50,000, with repayment required only when the property is sold or transferred. For owners of manufactured or mobile homes, loan amounts range from $1,000 to $30,000.

All applications are subject to HMLP eligibility requirements. For more information, visit www.cedac.org/hmlp or contact Brett Roberts at HMLP@berkshireplanning.org.


Tags: BRPC,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Pittsfield Sewer Lining Replacement Projects

PITTSFIELD, Mass.—; The City's Department of Public Services and Utilities sewer lining replacement project continues the week of Dec. 8.
 
The sewer lining will be replaced in several locations as outlined in the schedule below. This work includes lining aging sewer pipes to help prevent future breaks within the sewer line. There should be minimal to no impact on residential sewer lines during this work.
  • Dec. 8-10: Danforth Avenue (7:00 a.m. to 9:00 p.m.)
  • Dec. 11: Wahconah Street, between North Street and Seymour Street & Park Street between
  • Wahconah Street and Seymour Street (Overnight work-6:00 p.m. and 5:00 a.m.)
    • During this time, Wahconah Street, from North Street to Seymour Street, and Park Street, from Wahconah Street to Seymour Street, will be closed to traffic. Residents and emergency vehicles will be allowed to enter and exit the street if necessary. For more information about this project, please contact the Water Department at (413) 499-9339.
View Full Story

More Pittsfield Stories