image description

Greylock Thunder 18U Team Off to Hot Start at N.J. Tournament

iBerkshires.com SportsPrint Story | Email Story
MEDFORD, N.J. – Evelyn Julieano and Marlee Arnhold combined on a one-hitter Friday as the Greylock Thunder 18-and-under travel softball team improved to 2-0 at the John Biasi Memorial Super 72 tournament.
 
The Thunder opened its tournament with a 12-3 win over the Rise Up Showcase 18U Gold before beating the Untamed Softball Navy of New Jersey, 17-0.
 
Against the Rise Up squad, Kaleigh Jaros doubled and drove in three runs, and Arnhold went 2-for-2 with a double and a pair of RBIs. Grace Julieano and Paxton Ebling each doubled in the win.
 
Arnhold and Emma Lemire split the pitching duties in the first game, combining to strike out five.
 
In the day’s second win Kenadi Arnhold went 2-for-2 with a double and three RBIs, and Izzy Tart doubled. Grace Julieano was 2-for-2 at the plate with three RBIs in that game.
 
Evelyn Julieano and Marlee Arnhold combined to strike out three against Untamed Softball.
 
Saturday, the Thunder plays two more games at the tournament, taking on the Empire State Huskies and the CGA Hawks out of Pennslyvania.
 
If you would like to contribute information on this article, contact us at info@iberkshires.com.

Adams' Cook Street Bridge Slated for Replacement

By Sabrina DammsiBerkshires Staff
ADAMS, Mass. — The deteriorating Cook Street Bridge is slated for improvements, with the state favoring a superstructure replacement that would address the bridge's structural needs while minimizing impacts to the surrounding area.
 
The Cook Street Bridge primarily serves local traffic, spanning the South Branch of the Hoosic River and providing connections between the Ashuwillticook Rail Trail, Albert Street and Crotteau Street. It has a 12-ton weight limit.
 
The estimated cost at this point is $6.1 million.
 
The single-span bridge, originally constructed in 1957, has developed several structural deficiencies in recent years, including deteriorating steel beams with section loss and rusting, said Kasey Burke, project manager for the consulting engineering firm TEC. 
 
Additionally, there are holes in the underside of the deck that have exposed rebar, which is restricting travel across the bridge, she said. 
 
Deterioration of the bridge deck beneath the pavement is also resulting in several potholes on the road surface, which presents an ongoing maintenance issue for the town, Burke said. 
 
The planned replacement will have 10-foot striped travel lanes in each direction and be the same length of the current bridge, without adding any extra supports.
 
View Full Story

More Adams Stories