image description
King Elmer, one of the largest American elm trees in New England, sits on Summer Street near the intersection with Route 7.
image description
Ron Yaple and Michael Schmidt of Race Mountain Tree Services measure the circumference of King Elmer.
image description
Sixty-six infusion sites were drilled into the base of King Elmer to deliver a fungicide to ward off Dutch elm disease.
image description
image description
Michael Schmidt, left, and Ron Yaple prepare the fungicide for infusion.

Lanesborough's 'King Elmer' Inoculated Against Dutch Elm Disease

By Stephen DravisiBerkshires Staff
Print Story | Email Story

Michael Schmidt and Ron Yaple, foreground, install injection tees at the base of King Elmer.
LANESBOROUGH, Mass. — The king may have been dethroned, but the local tree committee is making sure he doesn't lose his crown.
 
"King Elmer," the American elm tree that towers above Summer Street near the junction with Route 7, once held the title for the largest such specimen in the commonwealth.
 
It since has been supplanted by a slightly larger tree in Old Deerfield Village, but with a height of 110 feet and an average crown measuring just more than 99 feet across, the tree named by Lanesborough Elementary School pupils in 2010 remains a regal presence.
 
Like elm trees across North America, Elmer's biggest threat is Dutch elm disease, which decimated the elm population in the United States after it was first identified in the country in 1928.
 
On Thursday, Ron Yaple and Michael Schmidt of Sheffield's Race Mountain Tree Services were in town to inoculate King Elmer against the dread disease.
 
Under the watchful eyes of members of the Lanesborough Tree and Forest Committee, which hired Race Mountain to do the work, the pair drilled 66 1-inch holes into the elm's base, plugged them with injection tees linked by tubing and slowly infused 77 gallons of water mixed with the fungicide to prevent regicide.
 
The historic tree already has fought off one bout with Dutch elm disease. That required both "surgery" and injections; Thursday's treatment was to help prevent a recurrence
 
"It had been infected," Yaple said of Elmer. "Another tree company excised the diseased significant branch, which you must do when you find infection.
 
"You have to excise back 10 feet from the point of vascular discoloration. Because it's a vascular disease, it readily spreads through the tree's vascular system and causes vessels to plug. That's the mechanism for the death of the tree."
 
The mechanism for spreading the disease is the elm bark beetle, which had a field day in America back in the middle of the 20th century.
 
According to a 1989 New York Times article, of an estimated 77 million elm trees in North America in 1930, more than 75 percent were lost by 1989.
 
That said, there are enough other elm trees in Elmer's domain to make the beetles a viable threat.
 
"For example, in my back yard, I have a 65-foot American elm that, about three years ago, it up and died in one season," said Jim Neureuther, the chair of the town committee. "And right now, if you go down to Laston Park ... there's an elm tree growing that's probably 50 foot tall. And right across the street on Route 7 from Laston Park is another elm tree. I know of another big elm tree that's down off of Stormview Road, about a quarter mile south of here.
 
"They're still around."
 
Race Mountain's Yaple said he probably treats about 20 elm trees each year. The trees generally are treated on a three-year cycle.
 
"Most are private, some public, some along the Route 7 corridor, some in streetscapes in various towns," he said. "Some are adopted by people. Very commonly, elm are adopted, and the process of injection is paid for by an individual who donates the fee."
 
In the case of King Elmer, Neureuther's committee has since 2004 implemented a maintenance program for the tree, which is believed to date back to around the time of the town's incorporation in 1765. That would make the monarch 255 years old.
 
The Tree and Forest Committee receives support from the town but also raises funds to support its preservation of Elmer and other initiatives, like plantings at Laston Park and on the grounds of Lanesborough Elementary School.
 
Thursday's treatment cost almost $1,200, Neureuther said. Over the past five years, the committee has received just more than $3,500 from the town while raising just shy of $10,000 from donations.
 
In addition to inoculations like the one it received on Thursday, the majestic elm requires regular pruning, most recently completed last spring.
 
"It was 2012 prior to that," Neureuther said of the pruning. "Right now, it's mainly for structural reasons. They don't want the weight imbalance to get too big. A tree like this, if it ever came down for some reason is going to cause a lot of damage."
 
Hopefully, that day will never come.
 
"The injections are really the only thing that assures us that King Elmer will still be around," Neureuther said. "If we were to stop them, you would imagine in a matter of 10 years there'd be no reason not to expect him to be infected.
 
"The injections are highly effective."

Tags: tree commission,   trees,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Bull Hill Road Well in Lanesborough Moves Forward

By Breanna SteeleiBerkshires Staff

LANESBOROUGH, Mass. — The Planning Board heard a proposal from the Village Fire and Water District about a proposed drinking-water supply well at 40 Bull Hill Road.

Officials with the village and with project developers Tighe and Bond gave the project description at the Planning Board's meeting on Monday.

Since 2020, the district has relied on the Minor Road Well, which they said is lacking a redundant water supply source. The Bull Hill Road project will establish a second groundwater source to meet current and future water demands, according to their site plan review application.

The district had previously discontinued its Bridge Street well because of PFAS contamination. Perfluoroalkyl and polyfluoroalkyl substances are a wide variety of chemicals used in consumer products. Exposure to sufficiently elevated levels may cause developmental effects in infants, impact certain organ functions and the immune system, elevate cancer risk, and cause other health effects.

The project well on Bull Hill Road will be on property the district acquired some time ago. It became a prospect for development around five years ago after the state ordered the district to abandon the Bridge Street well.

The project is on about 1.45 acres of land and will be a source of drinking water for about 2,400 residents.

"There's been a variety of testing completed, as well as a larger well has been drilled at the site, and the larger well, in hopes, would become the production well, as again, the redundant water supply, that's all been permitted so far and tested in accordance with MassDEP drinking water program regulations, and all of the tests came back astonishingly positive," said Joseph Popielarczyk, senior project manager and water/wastewater leader at Tighe and Bond. "So there's lots of water down there, and the water quality is great."

Construction is tentatively expected sometime in 2027 or 2028. He said generator procurement could affect the schedule, with lead times estimated at 40 to 52 weeks. They noted the facility could be built and tested before the backup generator arrived.

The project team described remaining permits and approvals, including MassDEP review and an anticipated Conservation Commission order of conditions. They also said funding was in place, while the timeline remained partly dependent on state review.

Resident Barbara Davis-Hassan asked whether nearby septic systems could threaten the well and whether sewer connections might be possible. 

Popielarczyk said the properties were outside the required source water protection's 400-foot Zone One area, and said there is no worry of contamination from nearby septic systems.

Hassan also asked about what the noise level would be. Popielarczyk said that there will be a generator for the well and that it would be outdoors in an enclosure that will minimize sound and would run mainly for periodic testing or during a power outage.

The board accepted the site plan.

View Full Story

More Lanesborough Stories