Flushing of Pittsfield's Water System to Begin

Print Story | Email Story
PITTSFIELD, Mass. — The city of Pittsfield's Department of Public Utilities announces that phase 1 of the flushing of the city's water system will begin Monday, April 22.
 
Water mains throughout the city will be flushed, through hydrants, over the upcoming weeks to remove accumulations of pipeline corrosion products. Mains will be flushed Monday through Friday each week, except holidays, between the hours of 7:30 a.m. and 3 p.m.
 
  • The upcoming flushing for April 22 to May 3 is expected to affect the following areas:
  • Starting at the town line on Dalton Avenue working west through Coltsville including lower Crane Avenue, Meadowview neighborhood, following Cheshire Road north.
  • Hubbard Avenue and Downing Parkway.
  • Starting at the town line on East Street working west through the McIntosh and Parkside neighborhoods.
  • Elm Street neighborhoods west to the intersection of East Street.
  • Starting at the town line on Williams Street, working west including Mountain Drive,
  • Ann Drive, East New Lenox Road, and Holmes Road neighborhoods.
Although flushing may cause localized discolored water and reduced service pressure conditions in and around the immediate area of flushing, appropriate measures will be taken to ensure that proper levels of treatment and disinfections are maintained in the system at all times. If residents experience discolored water, they should let the water run for a short period to clear it prior to use.
 
If discolored water or low-pressure conditions persist, please contact the Water Department at (413) 499-9339.
 
Flushing is an important operating procedure that contributes significantly to the maintenance of the water quality in the water distribution system. 

Tags: hydrants,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Lenco Celebrates $5M in Capital Investments

By Brittany PolitoiBerkshires Staff

Executive Vice President Lenny Light says it's not the equipment but the staff that gives Lenco its competitive advantage. 
PITTSFIELD, Mass. — Lenco Armored Vehicles has embarked on a $5 million capital investment project for faster, better manufacturing. 
 
A ribbon was cut on Monday in front of the company's new Trumpf TruLaser 3080, a machine designed to cut extra-large sheets of metal. This will increase the efficiency of building armored tactical vehicles, such as the BearCat, by about 40 percent. 
 
Executive Vice President Lenny Light recalled the Lenco's beginnings in 1981, when it operated out of 3,000 square feet on Merrill Road with 15 employees.  Today, Lenco has 170,000 square feet of manufacturing space and nearly 150 employees. 
 
"The work that we do here in Pittsfield contributes to millions of dollars being put back into our local economy. We're the largest commercial armored rescue vehicle manufacturer in the United States. We're one of the most respected brands locally. We also now own the largest fiber laser in the United States. It's the only one of its kind in the Northeast," he said, motioning to the massive, modern machinery. 
 
"But the equipment that we have is not our competitive advantage — our welders, our forklifts, our cranes — any company can buy this same exact equipment." 
 
Rather than the equipment, he said, it's the staff who shows up every day with a can-do attitude that gives Lenco its competitive advantage. 
 
Planning for the industrial cutter began 18 months ago, when the company needed to decide if it was the right equipment for the future. Trumpf, named for its founder, is a German-headquartered global manufacturer of high-end metal processing (computer numerical control) machines, including laser technology. The TruLaser 3080 uses a high-intensity laser beam to cut through metals with speed and accuracy.
 
View Full Story

More Pittsfield Stories