image description
Three concepts are being reviewed for the Four Corners Project. Clarksburg residents are asked to attend listening sessions to provide input on the final design.

Clarksburg Committee Seeking Input on Town Field Plans

By Tammy DanielsiBerkshires Staff
Print Story | Email Story

The MVP Committee last week reviews concepts for the town field developed by RDG. 
CLARKSBURG, Mass. — Residents are being encouraged to weigh in on the final design for the PFC Peter A. Cook Veterans Memorial Field.
 
The first listening session is set for Wednesday, Nov. 13, and the second on Wednesday, Dec. 11, both from 6 to 7:30 p.m. at the Community Center. Dinner will be served and attendees are urged to RSVP here
 
The town field is a focus of the Four Corners Project, an initiative to improve the field and prepare for better flood solutions in the face of climate change. The area includes Clarksburg School, the Senior/Community Center and the area around the intersections of West Cross, Cross and Middle Roads. 
 
The town's Municipal Vulnerability Preparedness Committee has been working for two years to find solutions to higher water incursions in the 100-year floodplain and its impacts on the field. The work with the Berkshire Regional Planning Commission has been funded through a state grant. 
 
Regenerative Design Group has come up with three concepts based on projected conditions and a community survey last year.
 
"This is sort of the gold, silver and bronze, I think," Courtney Morehouse of BRPC told the group at Thursday's meeting. "Concept A is maximizing the recreation and accessibility of the sites or the area ... Concept B is moving what's already there to make it more accessible, and adding recreation. And then Concept C is sort of changing the existing patterns altogether."
 
All three concepts include recreational areas, gardens/landscaping, parking and pathways at the town field and Community Center. All three also have alternatives for some street side parking. 
 
Concept A includes a baseball field, pickleball courts, basketball courts and a playground where the current basketball court is. Improved parking in the current parking lot and pathways, bridges and observation decks from the school and around the wetlands areas. 
 
Concept B removes the baseball diamond and shifts the pickleball courts to the Community Center to add grass parking and leaves the field open.
 
Concept C moves both pickleball courts and basketball court to the Community Center and puts the playground south of the pavilion.
 
"I'm thinking the accessibility trail is probably something like crushed gravel with a grade of no greater than 1 to 2 (percent) whatever it is the standard says, and then the boardwalk is going into the wetlands area," said Morehouse.
 
The field would be broken up into three areas of restoration to bring back some wetlands, existing field space and active recreation.
 
Committee members pointed out the need to shift the proposed crosswalk to the Community Center farther south because of the blind corner. 
 
They also discussed the suitability of a playground. "Maintenance is an issue, I think," said member Clebe Scott. 
 
"That's the No. 1 request we got from parents with kids," said Morehouse. "They want, like, somewhere to put their kids ... that can accommodate multiple ages."
 
Morehouse noted that there were three location options for the playground and that the designers were talking about a "natural playground" with boulders and such. 
 
Up in the air is an accessible pathway from the school to the field. The school had received a $1.2 million Safe Routes to School grant that is currently looking at travel along the road. 
 
Town officials would like more a small lane that connects to the town field to the school driveway but it's not clear MassDOT would fund that. 
 
Morehouse said she didn't know what the requirements are for a road and that might be part of a "mistranslation" with the state.
 
"A switchback [path] would be difficult. At least having the trail, having the road would be 1,000 times better," said Scott. "We're talking about the school here. We're talking about children, we're talking about traffic jams at the school every single day."
 
Member Robert Norcross said maybe it's a driveway. 
 
The listening sessions will include a presentation, breakout tables to discuss what residents like and dislike about the plans and chance to add notes to the maps of each one. 
 
Morehouse said those comments will be forwarded to the design group for integration. 

Tags: climate resiliency,   mvp,   recreation,   town field,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Affordable Housing Solutions Easy — and Complex

By John TownesSpecial to iBerkshires
This four-part series looks at the challenges in building affordable housing, and in May, Deep Dive will look at some solutions in Berkshire County. Read Part 1 here and Part 2 here.
 
The overall effort to solve the national and local housing crisis is paradoxically as straightforward as a game of checkers, but as complex and baffling as a Rubik's Cube puzzle.
 
On a basic level, the issue is clear. It boils down to two fundamental problems: There is a shortage of housing in all categories and the costs of buying or renting a home have escalated beyond the incomes of many people.
 
But because there is no single cause or "silver bullet" solution, the array of initiatives to make housing more plentiful and affordable can seem like a baffling maze of agencies, priorities, policies, regulations, and complex mathematical formulas.
 
The issue can also cause controversies and misunderstandings.
 
And for those who are seeking to buy or rent a home, the shortage of affordable housing can be personally frustrating, confusing, and even frightening. For some, it can lead to homelessness.
 
Nevertheless, while individual affordable-housing policies and programs differ in specifics, most rely on a core of basic strategies to deal with the underlying causes.
 
View Full Story

More North Adams Stories