image description
Chelsea Christenson, a civil engineer with Nitsch Engineering, presents the plans to the Conservation Commission on Tuesday.
image description
The designers offered two choices that were modified from the three original ones put forward.
image description

Greylock School Project Passes ConCom, Preps for Planning Board

By Tammy DanielsiBerkshires Staff
Print Story | Email Story

The School Building Committee opted to go with the post sign, but asked for changes to the font and graphics. 
NORTH ADAMS, Mass. — The Greylock School Project has passed one of two local permitting authorities in preparation for bidding documents to be released Nov. 17. 
 
The Conservation Commission gave the OK for the $65 million project on Tuesday.
 
"We're targeting a completion date for the documentation on Nov. 17," Jesse Saylor of TSKP Studio told the School Building Committee meeting just before the Conservation Commission. "The real reason that's later than we had anticipated is because of the local review meetings ... We have a Conservation Commission meeting, public hearing today, Oct. 21, at 6 p.m., that's what we're going to right after this meeting, and that will be our first time meeting with the Conservation Commission. ... 
 
"We anticipate meeting with the Planning Board at a public hearing on Monday, Nov. 10. If we're approved to proceed at that meeting, will be ready to go to bid. And so we've set the bid date one week later, leaving a week if there are any amendments that are required to the documentation."
 
Saylor and Chelsea Christenson, a civil engineer with Nitsch Engineering, presented the plans to the commission. 
 
"Our goal of the project is to bring nature to the students through the design of the school, also the building itself is a good environmental steward," said Saylor. The building systems are all electric. No fossil fuels are used to heat or cool the building. Energy models anticipate that the building will be highly energy-efficient thanks to its highly insulated walls and roof and also due to geothermal wells that will harvest the relative warmth of the earth in the winter and its coolness in the summer to offset human cooling loads."
 
The site itself "retains some natural resources worthy of protection," he said, including an intermittent stream that runs into a pipe on the southern edge and, to the north, there's a "more significant" wetlands area.
 
The stream will not be affected and the wetlands are part of the school drainage will continue to be fed that way. The project also is not expected to affect Well No. 2, a backup for the city's water system. 
 
"The project will also conserve mature tree growth at the north edge of the site and at the south edge of the site, which creates a natural buffer to residential residential neighborhoods to the north and south," Saylor continued. 
 
Con Com Chair Andrew Kawczak asked the city's Public Services Commissioner Timothy Lescarbeau, who was in attendance, if the plan met the wellhead protection requirements. 
 
"The well is in a non-conforming zone to begin with, because it's close to the roads and you know the school, the old school," he said. "The area is much better now than it was considering GreylockWorks was an aluminum anodizing plant that always made me cringe. Now it's retail and rental space, residential, so I don't see any impact from this."
 
Christenson walked through the details for water drainage and catchment, noting "we did get a letter from DEP Water Resources supporting the project."
 
In response to questions, she and Saylor elaborated that the turtle pond is a manmade educational component and not part of the water management system.
 
"A lot of design and research has gone into this pond to make these turtles survive," Christenson said. "I know our landscape architects have done a lot of research on what they need and hibernation and all sorts of things. So it's been fascinating listening to it."
 
The turtle pond was a feature of the open courtyard in the old school that is being replicated in the new school. Saylor said it will be lined without about 3 feet depth of sand, though there are conversations about the depth because of the age of the children in prekindergarten-through-Grade 2 school.  
 
Before the commission meeting, the School Building Committee narrowed down its choices on the main sign. The members had not liked the previous iterations, so TKSP came back with options incorporating their feedback.  
 
"There's a attempt in both of these signs to kind of match up with the building in a little bit of an abstract way," said Saylor. 
 
They were offered a modification of the post sign with straight rather than peaked top (Option 1) and a simpler sign using the vertical fiber cement siding planned for the school with a flat top (Option 3). Members liked the graphic on the post sign and the sided option but there were concerns it looked too much like a bench for hanging out. Several stated concerns on the font and the ability to read the lettering; Superintendent Timothy Callahan reminded them the signs would be about 8 feet long, which would be reflected in the letter.  
 
"I want something that has a little bit more whimsy, that's a little bit more exciting, because, like, we're making this for them, like we want them to see the sign and get excited," said member Andrew Rosenburg, pitching for the post sign. "It's a nice time, but 3. That's I feel like it kind of goes towards more adult sensibilities."
 
The members voted for Option 1, the post sign, but asked for more work on the font and graphic.
 
The committee also voted to hire Energy Tax Savers Inc., a consulting firm specializing in green energy grants, to work on its federal geothermal financing. 
 
Tim Alix of Collier's International, the owner's project manager, said it's been recommended by other districts and the Massachusetts School Building Authority to have a consultant because the applications will be completed after the system in operational. 
 
"By having somebody work with us and assist us, we'll be requesting that the contractor document the costs and breakdowns in such a way that we have all that information available to us, and this consultant would then work with the district on assembling that application and submitting those those documents," he said. 
 
Collier's sought three proposals and Energy Tax Savers was the lowest at $15,900 compared to the other two about $50,000 with alternative add-ons. 
 
"I think that that would be the outfit to go with, the prices which is more reasonable, and we have experience of working with them, and things have gone well," Alix said. 
 

Tags: Greylock School Project,   

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Friday Front Porch Feature: A Charming House Like New

By Breanna SteeleiBerkshires Staff

The home prior to renovations.

NORTH ADAMS, Mass. Are you looking for a newly renovated home with great space? Then this might be the perfect fit for you!

Our Friday Front Porch is a weekly feature spotlighting attractive homes for sale in Berkshire County. This week, we are showcasing 100 Autumn Drive.

This three-bedroom, two-bathroom split level was built in 1965 and is 1,396 square feet on 0.32 acres.

The house was completely renovated recently. It includes a one-car garage, and comes with appliances including a dishwasher and stove/oven, and other major appliances.

The house is listed for $359,500.

We spoke with owners Michael Zeppieri and Chris Andrews, who did the renovations. Zeppieri is an agent with Alton and Westall Real Estate Agency.

What was your first impression when you walked into the home?

Zeppieri: I purchased this home to do a full renovation flip and saw tremendous potential in this mid-century split level home that had not been updated since it was built in the 1960s, in a great North Adams neighborhood.

 

Andrews: The house was a much different house when we first purchased it in 2022 (photo attached is from about 2010.)  The interior was painted all in dark colors and we brightened it up with neutral colors. The transformation makes you feel like you are in a totally different house.  

 

 

What were the recent renovations, any standout design features?

 

Zeppieri: The house has had a complete reconfiguration including new kitchen with high-end appliances, ceramic tiled baths, hardwood floors, new windows and roof ... just to name a few.  All a buyer has to do is move in and enjoy.

 

Andrews: Yes, we renovated the entire house.  New windows, new roof, all new custom black gutter system, new blacktop driveway, hardwood floors were installed through out the house. New kitchen and bathrooms as well as painting the exterior and interior of the house.  New paver patio in the back yard.

 

What kind of buyer would this home be ideal for?

 

Zeppieri: The buyer for this home could be a first-time homebuyer or a retiree ... the location is close to attractions in North Adams ... and the property is located in Autumn Heights, which is a very small residential development with several long-term owners.

 

Andrews: This home is truly ideal for a variety of buyers. Whether a first-time homebuyer, a small family or even someone looking to downsize from a larger home.

 

 

What do you think makes this property stand out in the current market?

 

Zeppieri: The location, price and move-in condition of this home make it a true market leader in the North Adams Market.

 

Andrews: This house is completely renovated and in a desirable location of North Adams. The natural light in the home really makes the interior pop. And with all the upgrades the home stays quite cool in the summer months.

Do you know any unique stories about the home or its history?

Zeppieri: This home was built for the Gould family in 1969 and they lived there till 2010. It was always a family home during that time in which the Goulds had two children ... and Virgina Gould managed Mohawk Forest Apartments and was a very active resident of North Adams.

 

Andrews: Built in about 1965.

 

What do the current owners love about this home?

 

Zeppieri: As the current owner it was a fun project to transform this home and get it ready for its next adventure with a new family to enjoy for many years.

 

Andrews: No one has lived in the house since we purchased the home. The new owners would be the first to live in the house since the renovations have been completed.

 

 

What would you say to a buyer trying to imagine their life in this space?

 

Andrews: I would suggest seeing the house either on a sunny day or at twilight to really get a vision of how special the home feels.  

 

You can find out more about this house on its listing here.

*Front Porch Feature brings you an exclusive to some of the houses listed on our real estate page every week. Here we take a bit of a deeper dive into a certain house for sale and ask questions so you don't have to.

 

 

 

 

View Full Story

More North Adams Stories