image description
Adams' fanciful staircase from Town Hall's upper parking lot is closed because of structural concerns.

Adams Town Hall's Back Parking Lot Staircase Closed

By Sabrina DammsiBerkshires Staff
Print Story | Email Story
ADAMS, Mass. — The staircase behind Town Hall was closed earlier this month as a safety precaution.
 
The winding staircase features two gazebo-style landings and leads to the rear parking lot, which sits atop a hill overlooking Town Hall.
 
Town Administrator Nick Caccamo said he closed the staircase out of an abundance of caution because it seems that most of the structure is on borrowed time. 
 
He highlighted several concerns, including multiple staircase footings that are or have been sliding off the concrete pilings, as well as significant erosion underneath the structure.
 
The timeline for repairs remains unclear. In the meantime, employees can walk down the driveway on the north side of the building and enter through that side.
 
Visitors are able to park on the street in the front of Town Hall and use the front entrance; there is also handicap parking at the side of the building, behind the bank. 
 
Caccamo was unsure of the age of the staircase but believes that it was built during the Town Hall renovation project. 
 
The town offices were moved to the Plunkett mansion, formerly the American Legion Post home, in 1996.
 
The town will need to hire an engineer to create build documents and go through the appropriate bidding process depending on the cost estimates, he said. 
 
The hope is that the town can utilize the existing retaining wall at the bottom near the split and construct a more direct route up to the parking lot.
If you would like to contribute information on this article, contact us at info@iberkshires.com.

Adams Fire Plans to Keep Public Informed on Station

By Breanna SteeleiBerkshires Staff

ADAMS, Mass. — The Prudential Committee hopes to invite the public to see the fire station and explain its needs.

The Fire District is trying to address the deteriorating building and is moving forward with a needs assessment by Jacunski Humes Architects, a company that specializes in public safety design. The $8,000 for this was approved at the annual meeting earlier this year. 

The first order of the process is the space needs assessment. Fire Chief David Lennon and Water Superintendent John Barrett at the July 27 meeting discussed inviting the public to tour the building as they start the assessment.

In other news, the Fire Department hired a full-time firefighter and three on-call firefighters.

The board discussed new jackets for employees who are 65 and older to signify and distinguish them when at a scene. This is to prevent the Fire Department from running afoul of a state law mandating retirement of active firefighters at age 65. 

The district is also still mulling expanding the district townwide. It currently does not cover areas of the town that are not on the water system but the Fire Department responds to any fire and emergency calls within the town's borders. 

View Full Story

More Adams Stories