ADAMS, Mass. — The Fire Department's Engine 2 is suffering from rust and the Prudential Committee needs to decide if it should be fixed or run until it can be replaced.
Fire Chief David Lennon told the Prudential Committee on Monday about the condition of the 20-year-old truck and acknowledged it's going to be an costly endeavor.
"If we choose to do this, it's going to be so expensive that it would have to be put out for multiple people to look at and possibly bid on, but moreover, we have to look at what the long-term plans are to decide if we want to spend that money on that truck," he said. "If we're going to replace it on its usual schedule, which would be in under 10 years now, so we have to decide."
Lennon said his thought was that it was similar to getting a medical diagnosis: since they've got one opinion, "it'd behoove us to get a second opinion to see.
"We see that it's rusting, but is that rust going to be completely detrimental to running that for the period that we want to run it for, and have somebody else look at it now," he said. "As far as who that would be, I don't know, but I think that's what we should discuss and see moving forward."
The committee set a workshop for Friday, Sept. 11, at 4 p.m.
Superintendent John C. Barrett said he plans to install a new system and water main for the Adams Housing Authority's 64 one-bedroom units in the Columbia Valley facility, which will mean a new suppression system for all of the buildings.
The 1970s complex does not have sprinklers; just a four-inch potable service and a private hydrant. It is likely to need a new 4-inch connection for sprinklers and the district has flow-tested mains on Columbia Street already.
To save costs for the housing authority, the district may recommend connecting on Valley Street if hydraulically adequate, Barrett said. A hydraulic analysis for Valley Street will be done once the authority applies for the connection.
In other news, bookkeeper Victoria Lassonde noted they will need to update personnel rules and regulations for the new on-call position and will bring specific sections for change to the next agenda.
She said they need to formally approve pay scales that were discussed during the budget process, which is important because on-call first-quarter payments in October must align with approved scales.
If you would like to contribute information on this article, contact us at info@iberkshires.com.
Your Comments
iBerkshires.com welcomes critical, respectful dialogue. Name-calling, personal attacks, libel, slander or foul language is not allowed. All comments are reviewed before posting and will be deleted or edited as necessary.
No Comments
Adams' Cook Street Bridge Slated for Replacement
By Sabrina DammsiBerkshires Staff
ADAMS, Mass. — The deteriorating Cook Street Bridge is slated for improvements, with the state favoring a superstructure replacement that would address the bridge's structural needs while minimizing impacts to the surrounding area.
The Cook Street Bridge primarily serves local traffic, spanning the South Branch of the Hoosic River and providing connections between the Ashuwillticook Rail Trail, Albert Street and Crotteau Street. It has a 12-ton weight limit.
The estimated cost at this point is $6.1 million.
The single-span bridge, originally constructed in 1957, has developed several structural deficiencies in recent years, including deteriorating steel beams with section loss and rusting, said Kasey Burke, project manager for the consulting engineering firm TEC.
Additionally, there are holes in the underside of the deck that have exposed rebar, which is restricting travel across the bridge, she said.
Deterioration of the bridge deck beneath the pavement is also resulting in several potholes on the road surface, which presents an ongoing maintenance issue for the town, Burke said.
The planned replacement will have 10-foot striped travel lanes in each direction and be the same length of the current bridge, without adding any extra supports.
The single-span bridge, originally constructed in 1957, has developed several structural deficiencies in recent years, including deteriorating steel beams with section loss and rusting. click for more
Gabe Thomas carded an even par round of 71 at Stockbridge Golf Club Monday to finish two shots clear of the field and claim the first county individual championship for the McCann Tech golf team. click for more
The event showcases the strong sense of community that defines Adams while offering the perfect opportunity to enjoy the fall foliage, which is typically near its peak this time of year. click for more
During a routine compliance check last Thursday, a Tri-Town Health Department employee under the age of 21 attempted to purchase a pack of Camel Blue cigarettes without presenting identification at the gas station, located at 95 Commercial St.
click for more