Pittsfield Road Cut Moratorium

Print Story | Email Story
PITTSFIELD, Mass. — The city's annual city road cut moratorium will be in effect from Nov. 29, 2024 to March 15, 2025. 
 
The road cut moratorium is implemented annually, as a precautionary measure, to ensure roads are kept clear of construction work during snow events and to limit the cuts in roads that are filled with temporary patches while material is unavailable.
 
During this period, steel plates are not to be used to cover open excavations in roads. Also, the Department of Public Services and Utilities will not be issuing the following permits:
 
• General Permit
• Sewer Public Utility Connection Permit
• Stormwater Public Utility Connection Permit
• Water Public Utility Connection Permit
• Trench Permit
 
Limited exceptions will be made for emergency work that is determined to be an immediate threat to the health or safety of a property or its occupants.
If you would like to contribute information on this article, contact us at info@iberkshires.com.

Pittsfield Schools Schedule Morningside, Budget Hearings This Week

By Brittany PolitoiBerkshires Staff

PITTSFIELD, Mass. — The School Committee will hold another public hearing for the potential closure of Morningside Community School.

On Thursday, April 9, at 6 p.m., community members will have the chance to give feedback in the Reid Middle School library. Last month, the Pittsfield Public Schools announced the possible closure of Morningside, which serves elementary grades, for the 2026-2027 school year and redistribution of its students to other city schools.

In the last couple of weeks, the district has solicited input from employees and community members through meetings at the school. 

Morningside Community School was built in the mid-1970s with an open classroom concept. Morningside serves about 374 students and has a 7 percent accountability score, outperformed by 93 percent of the state.

For fiscal year 2027, the district has allocated about $5.2 million for the school. The committee has also requested a version of the proposed $87.2 million district budget with Morningside closed. 

Pittsfield has another open concept school, Conte Community School, that is planned to consolidate with Crosby Elementary School, and possibly Stearns Elementary School, in a new building on the Crosby site by 2030. The status of the project's owner's project manager will be discussed on Tuesday, April 7, at 5 p.m. at Taconic High School during the School Building Needs Commission meeting. 

That leaves the school officials wondering if Morningside students could have better educational outcomes if resources followed them to other nearby schools.  Interim Superintendent Latifah Phillips has stressed that a decision has not yet been made. 

Considerations for the school’s closure include: The feasibility of the facility to provide a conducive teaching and learning environment with an open campus design, the funding allocation needed to ensure Morningside students can have equitable learning opportunities, and declining enrollment across Pittsfield elementary schools.  

View Full Story

More Pittsfield Stories