Adams Holiday Home Decorating Contest Registration Open

Print Story | Email Story

ADAMS, Mass. — The Events Committee in Adams has announced the details for the 2024 Holiday Home Decorating Contest. 

All residents within the boundaries of the Town of Adams are eligible to participate.  Entry applications are available on the Town's website and must be received no later than 5 pm on Friday, December 6, 2024.  Once all registrations have been received, a map will be created and posted online Wednesday, December 11.

Contest is for exterior decorations only, including decorations in windows that are visible from the exterior.  Judging will be done from outside the residence only and from the street; community members are not to enter the property to view back or side yards.   

Three prizes will be awarded:  One 1st prize - $150.00 Gift Card to the Adams Hometown Market, One 2nd prize - $100.00 Gift Card to the Adams Hometown Market and One 3rd prize - $50.00 Gift Card to the Adams Hometown Market.  The Community Choice award winner will receive a gift card.

The community is encouraged to drive around and view all the entries and cast a vote using the online voting form.  Judging will be done from 5:00 pm to 8:00 pm on Friday, Dec. 13 – Sunday, Dec. 15, 2024.  The on-line app will be open until 8 pm on December 15 for community members to cast their votes.  A Judging Panel will choose 1st, 2nd, and 3rd place winners.  The community will choose the Community Choice winner. 

Holiday Home Decorating participants should ensure that all lights, animations and decorations are in place and activated for the judging periods on both nights.

Entry is free as there are no costs or fees to apply to participate.  The Committee encourages residents to be creative, festive, fun and safe this holiday season.

Visit https://www.town.adams.ma.us/ to sign up or learn more about this event.

If you would like to contribute information on this article, contact us at info@iberkshires.com.

Adams' Cook Street Bridge Slated for Replacement

By Sabrina DammsiBerkshires Staff
ADAMS, Mass. — The deteriorating Cook Street Bridge is slated for improvements, with the state favoring a superstructure replacement that would address the bridge's structural needs while minimizing impacts to the surrounding area.
 
The Cook Street Bridge primarily serves local traffic, spanning the South Branch of the Hoosic River and providing connections between the Ashuwillticook Rail Trail, Albert Street and Crotteau Street. It has a 12-ton weight limit.
 
The estimated cost at this point is $6.1 million.
 
The single-span bridge, originally constructed in 1957, has developed several structural deficiencies in recent years, including deteriorating steel beams with section loss and rusting, said Kasey Burke, project manager for the consulting engineering firm TEC. 
 
Additionally, there are holes in the underside of the deck that have exposed rebar, which is restricting travel across the bridge, she said. 
 
Deterioration of the bridge deck beneath the pavement is also resulting in several potholes on the road surface, which presents an ongoing maintenance issue for the town, Burke said. 
 
The planned replacement will have 10-foot striped travel lanes in each direction and be the same length of the current bridge, without adding any extra supports.
 
View Full Story

More Adams Stories