image description

Repairs Planned for Silver Lake's Underwater Cap

Starting next month, a thinning portion of Silver Lake's underwater cap will be repaired.

image description

GE Plans for PCB Removal Gets OK

Approximately 75 percent to 80 percent of the material to be removed from the river will be transported hydraulically without the need for any trucks.

image description

GE Buildings 12 & 14 Demolished in Pittsfield

General Electric's former Buildings 12 and 14 are demolished and the debris will soon be capped.

image description

Health, Environmental Officials: Pittsfield GE Landfills Don't Pose Risk

Residents continue to express concerns about PCB exposure from the former General Electric campus but health and environmental experts say there is no risk.

image description

PCBs Detection Pauses GE Demolition

Elevated levels of PCBs in a single air sample have halted demolition work on the former General Electric site.

image description

EPA Lays Out Draft Plan for PCB Remediation in Pittsfield

U.S. The Environmental Protection Agency and General Electric have a preliminary plan to remediate polychlorinated biphenyls from the city's Rest of River stretch by 2032.